Quay Crane Repair Quality Assessment

LOCATION
Norway
CRANES SURVEYED
4 Quay Cranes
ASSESSMENT TYPE
Repair Quality Assessment

MEASUREMENT METHODS
Strain Gauges & Accelerometers

PROJECT OVERVIEW

The Challenges

Four quay cranes were surveyed. To reduce significant structural vibration during crane operation, repairs to the trolley, trolley rail and boom-girder hinge had previously been carried out by another company. The effectiveness of the repair was assessed using measurement data obtained before and after the repair from strain gauges and accelerometers

FIELD MEASUREMENTS

Strain Gauge & Accelerometer Measurements

> Strain gauges installed on the crane structure

> Instrumentation installed for crane vibration measurements

MEASUREMENT RESULTS

Before & After Repair Evaluation

> Measured vibration response during crane operation

> Measurement data obtained before and after the repair was used to evaluate the effectiveness of the implemented repairs

PROJECT OUTCOME

Repair Effectiveness Assessment

The effectiveness of the repairs to the trolley, trolley rail and boom-girder hinge was assessed using measurement data obtained before and after the repair from strain gauges and accelerometers. The assessment provided an engineering basis for evaluating the quality and effectiveness of the repair work performed on the quay cranes