The goal of this project was to determine the possibility and conditions for further operation of a ship-to-shore container crane manufactured in 1976, based on the condition of the metal structure and actual operating conditions.
The assessment included inspection of the boom steel structure, structural analysis for different trolley positions, stress measurements at critical points of the boom structure, and residual life assessment.