Gantry crane structure analysis due to surveying the possibility of the crane productivity increasing

The Challenges:

The crane has been checked for the possibility to work with the maximal lifting load of 40t at all outreaches.
Initially the maximum outreach has been constrained up to 25 meter outreach for SWL 40 t by the manufacturer.